MVP design & development
Turn funding into a working product.
Product logic, UX/UI and a design system developers can build from. With full development when you need it, from first screen to launch.
- Fixed price from €40k, or a dedicated team
- Design and build, one team
- Funded teams ready to launch
(01) The problem
The first version sets the pace.
An MVP built in a rush becomes the thing you rebuild a year later. Scope creeps, design and engineering drift apart, and launch dates slip while the runway shrinks.
Scope that keeps growing
Every meeting adds a feature, nothing gets cut.Design and dev out of sync
Handoffs lose detail and screens get built twice.Separate suppliers to coordinate
You become the project manager nobody hired.A launch date on the move
Each slip costs runway and momentum.
(02) What you get
Everything to launch and learn.
Product logic
A prioritised scope, user flows and the smallest feature set that proves the business.
UX/UI design
Every screen in scope, and the core journeys tested with real users before development starts.
Design system
Components, tokens and documentation your developers can build from and extend.
Development
Front-end and back-end build, QA and release, run by the team that designed it.
(03) How it runs
From scope to launch.
Weeks 1–2
Scope
Workshops to agree the problem, the users and the features that make the first release.Flows
User journeys and wireframes for every core path.Weeks 3–6
Design
High-fidelity UI and a design system, tested with users as we go.Architecture
Tech stack, data model and integrations planned alongside the design.Weeks 7–14
Build
Two-week sprints with a working demo at the end of each one.QA
Testing on real devices and browsers before anything ships.
Launch
Release, analytics in place and a backlog for version two. We stay on for iteration or move into a dedicated team.
(04) Why this way
One team, not three.
One studio teamOur way
- Who you manageOne lead, one channel
- Design to codeDesigners and engineers in one team
- Time to launchPlanned, fixed-scope sprints
- After launchThe same team can keep shipping
Separate suppliersThe usual way
- Who you manageDesigners, devs and QA separately
- Design to codeFiles thrown over the wall
- Time to launchSlips with every dependency
- After launchContinuity depends on each supplier
(05) Engagement
Pick the model that fits.
Fixed scopeFrom
€40k
A set feature list, timeline and price, agreed upfront.
Dedicated teamFrom
€8k
Per specialist, per month, for roadmaps that keep evolving.
Format
Sprint demos
Working software every two weeks during the build, one point of contact.
Not sure it fits? Let’s look at your case together.
Book a 30-min call (opens in a new tab)(07) Other services
Other ways we help.
- Founders shaping an idea or preparing to raise
Pitch deck & product concept
Fixed-price sprint · 4 weeks - Live products losing users or momentum
UX audit & product discovery
Fixed-price sprint · 2–3 weeks - Mature products hitting a growth ceiling
Product rebuild & redesign
Fixed-price phases · design and dev - Scale-ups & enterprise
Dedicated product team
Monthly team · 30-day notice - Teams buried in manual work
AI automation
Fixed-price pilot, then scale - Sites outgrowing a legacy CMS
Legacy website migration
Fixed-price migration · 6–12 weeks



